4.3 General Standards
4.3.1 Scope:the quality acceptance of the erection project of pipes for the thermal power plants.Visual examination and cleaning of pipes is shown in Table 4.3.1-1,The prefabrication of pipes is shown in Table 4.3.1-2.The inspection and erection of valves is shown in Table 4.3.1-3.
4.3.2 Inspection quantity:detailed inspection shall be carried out according to the items.
4.3.3 Quality criteria:in accordance with the requirements in Table 4.3.1-1 to Table 4.3.1-3.
Table 4.3.1-1 Visual examination and cleaning of pipes
![img](https://epubservercos.yuewen.com/6CF431/18000634801101506/epubprivate/OEBPS/Images/txt004_46.jpg?sign=1738942874-SwGYoJLhkHfjA4hnKmHYybx7NMtahhbt-0-685027f9641f578d07d343deae2d2f02)
Table 4.3.1-1(Continued)
![img](https://epubservercos.yuewen.com/6CF431/18000634801101506/epubprivate/OEBPS/Images/txt004_47.jpg?sign=1738942874-1z0grKKGZIEMEo44N9Y2pN7idnwYkCx8-0-addf14635dd80433c848147a27bd767b)
Table 4.3.1-2 Prefabrication of pipes
![img](https://epubservercos.yuewen.com/6CF431/18000634801101506/epubprivate/OEBPS/Images/txt004_48.jpg?sign=1738942874-tgdxzQ8nHsEoS780kRGS1BoctFmNKuhT-0-3c21ac5491900c74ae0a91db1c2a56d9)
Table 4.3.1-3 Inspection and erection of valves
![img](https://epubservercos.yuewen.com/6CF431/18000634801101506/epubprivate/OEBPS/Images/txt004_49.jpg?sign=1738942874-YJEgIObdAfCdNA8zBOIumvT80woX19BA-0-afb110ba705358f2b523294b1895dc4a)