4.3 Material
Dominant Items
4.3.1 Types,specifications,quality,quantity and performance of materials and standard parts must be in accordance with requirements of the design documents and the current national standards;acceptance inspection shall be carried out where they enter the construction site and records shall be made.
Inspection quantity:exhaustive check of the qualification certificates;1% by physical spot check(not be less than 5 pieces).Recheck shall be madeif required by the design documents or relevant national standards.
Inspection method:check quality certificates;recheck report and acceptance record;appearance inspection or actual measurement.